Construction Update: The Headrow Works

As part of the ongoing works to connect buildings to the Leeds PIPES heat network, our team will be extending the heat network by installing district heating pipework in the ground from The Headrow footway, across the bus lanes and footpath into the city centre.

These works will take place from 7.30am – 5.30pm, Monday to Sunday, with work starting on Saturday 15th February 2025 and completing Monday 3rd March 2025. A number of traffic and footpath diversions have been put in place and can be found in the following pages, relating to the three phases of work that will be completed within the 17 day period.

We will strive to keep any disruption and noise to a minimum as we connect more of Leeds City Centre to reliable, affordable, low carbon, heat and hot water.

 

Phases of work:

Phase 1 | 15th & 16th February 2025. Full road closure, including suspension of the Bus Lane. Be aware the footway will be closed on west bound closure (next to bus shelter)

Please refer to documents titled:

  • Headrow – Phase 1 Diversion Rev A
  • Headrow – Phase 1 Detail Rev A

 

Phase 2 | 15th to 23rd February 2025. East bound road closure, including suspension of the Bus Lane.

Please refer to document titled:

  • Headrow – Phase 2 Diversion Rev A
  • Headrow – Phase 2 Detail Rev A

 

Phase 3 | 22nd & 23rd February 2025. Full road closure, including suspension of the Bus Lane.

Please refer to document titled:

  • Headrow – Phase 1 Diversion Rev A
  • Headrow Phase 1 Detail Rev A

 

Please note that works vehicles will be parked within the closure on The Headrow to comply with Construction Design and Management regulations. There will also be suspension bus gates on Infirmary St and East Parade in line with bus gate timing on The Headrow.

 

Diversions:

Leaving the city diversion:

  • From The Headrow turn left onto Park Row
  • Right onto Infirmary St
  • Right onto East Parade and continue onto Calverley St
  • Turn left onto Portland St
  • Continue onto Great George St and
  • Then turn left onto Park St before re-joining Westgate

 

Heading into the city diversion for bus:

  • Turn Left onto Oxford Place
  • Following the road right onto Great George St, turn right onto Albions St before rejoining The Headrow

 

For maps referring to the above diversion instructions please refer to documents referenced in phase 1 to 3 above.

Please see images below of the plans for the phased scheme of works.

Phase 1 –

Headrow – Phase 1 Diversion Rev A

Headrow Phase 1 Detail Rev A

15th & 16th February 2025

 

Phase 2

Headrow – Phase 2 Diversion Rev A

Headrow Phase 2 Detail Rev A

15th Feb to 23rd Feb 2025

 

Phase 3

Headrow – Phase 1 Diversion Rev A

Headrow  Phase 1 Detail Rev A

22nd and 23rd February 2024